← Back to Carrying & Impact Idlers
CEMA E Unequal Troughing Idler CEMA E
Carrying & Impact Idlers · BW 36"–96"

CEMA E Unequal Troughing Idler

CEMA E · offset L1/L2 · 20/35/45° · welded frame
CEMA GradeE (Extra Heavy-Duty)
Roller LayoutL1 center longer, L2 sides shorter
Roller Diameter6" & 7" (Ø150–180mm)
Trough Angle20° / 35° / 45°
Belt Width36"–96" (900–2400mm)
FrameWelded robust channel
SealIP66 labyrinth

Product Overview

The CEMA E Unequal Troughing Idler uses a longer center roller and two shorter side rollers (offset L1/L2) to spread the loaded belt more evenly than an equal layout, reducing edge loading and belt wear on high-tonnage mining, quarry and cement carrying-side belts at 36–96 inch. A welded robust channel, lifetime-lubricated spherical bearings and IP66 multi-stage labyrinth seals meet the CEMA E rating, while the offset geometry also stabilizes the belt through transition zones and heavy bulk transfer points.

Key Features

CEMA Grade
E (Extra Heavy-Duty)
Roller Layout
L1 center longer, L2 sides shorter
Roller Diameter
6" & 7" (Ø150–180mm)
Trough Angle
20° / 35° / 45°
Belt Width
36"–96" (900–2400mm)
Frame
Welded robust channel
Seal
IP66 labyrinth

Applications

How to Choose This Component

Why Source These Spare Parts From Us

Frequently Asked Questions

What build grade and rating is the CEMA E Unequal Troughing Idler?

CEMA E Unequal Troughing Idler is supplied at E (Extra Heavy-Duty). It is engineered to match CEMA D/E and ISO expectations for BW 36"–96" belt duty and can be customized to your dimensions, lagging and finish.

What belt widths does the CEMA E Unequal Troughing Idler cover?

This component is sized for BW 36"–96". Send your exact belt width, required angle or diameter and installation spacing when requesting a quote so we can confirm a direct, drop-in fit.

How is the CEMA E Unequal Troughing Idler sealed against dust and water?

Protection follows IP66 labyrinth. Labyrinth-style sealing keeps grease in and fines, moisture and wash-down out, extending service life in harsh bulk-handling conditions.

Can I order a custom CEMA E Unequal Troughing Idler?

Yes. Dimensions, lagging or coating, seal, shaft and finish are built to your specification; standard lead time is 15–25 working days and 30–45 days for fully custom builds.

Ordering & Customization

Typically Paired With

Components commonly ordered alongside this part to complete the station:

Related Products

← Previous
CEMA D Equal Troughing Idler 5" / 6"
Next →
CEMA D Unequal Troughing Idler

Request a Quote

Specifications for: CEMA E Unequal Troughing Idler. Send us your requirements and we'll reply within 48 hours.

Prefer email? Write to jialuode@gmail.com.

Get Quote