← Back to Carrying & Impact Idlers
CEMA D Unequal Impact Troughing Idler Impact D
Carrying & Impact Idlers · BW 24"–72"

CEMA D Unequal Impact Troughing Idler

CEMA D · cushion rings · offset layout · 5"/6"
CEMA GradeD (Heavy-Duty)
FeatureRubber cushion rings larger than shell
Roller Diameter5" & 6" (Ø127–150mm)
Trough Angle20° / 35°
Belt Width24"–72" (600–1800mm)
FrameHeavy impact frame
PositionLoading zone / transfer point

Product Overview

The CEMA D Unequal Impact Troughing Idler combines offset L1/L2 geometry with rubber cushion rings to absorb bulk drop energy at crusher discharge and quarry loading chutes on 24–72 inch belts. The unequal spread eases edge loading while the larger-than-shell rings deform elastically under impact; a heavy impact frame, sealed bearings and IP66 labyrinth seals keep it running where solid steel rollers would bind or fatigue. A cost-effective impact-zone alternative to the E grade.

Key Features

CEMA Grade
D (Heavy-Duty)
Feature
Rubber cushion rings larger than shell
Roller Diameter
5" & 6" (Ø127–150mm)
Trough Angle
20° / 35°
Belt Width
24"–72" (600–1800mm)
Frame
Heavy impact frame
Position
Loading zone / transfer point

Applications

How to Choose This Component

Why Source These Spare Parts From Us

Frequently Asked Questions

What build grade and rating is the CEMA D Unequal Impact Troughing Idler?

CEMA D Unequal Impact Troughing Idler is supplied at D (Heavy-Duty). It is engineered to match CEMA D/E and ISO expectations for BW 24"–72" belt duty and can be customized to your dimensions, lagging and finish.

What belt widths does the CEMA D Unequal Impact Troughing Idler cover?

This component is sized for BW 24"–72". Send your exact belt width, required angle or diameter and installation spacing when requesting a quote so we can confirm a direct, drop-in fit.

How is the CEMA D Unequal Impact Troughing Idler sealed against dust and water?

Protection follows sealed, labyrinth-protected construction. Labyrinth-style sealing keeps grease in and fines, moisture and wash-down out, extending service life in harsh bulk-handling conditions.

Can I order a custom CEMA D Unequal Impact Troughing Idler?

Yes. Dimensions, lagging or coating, seal, shaft and finish are built to your specification; standard lead time is 15–25 working days and 30–45 days for fully custom builds.

Ordering & Customization

Typically Paired With

Components commonly ordered alongside this part to complete the station:

Related Products

← Previous
CEMA E Equal Impact Troughing Idler
Next →
CEMA E Self-Aligning Troughing Idler

Request a Quote

Specifications for: CEMA D Unequal Impact Troughing Idler. Send us your requirements and we'll reply within 48 hours.

Prefer email? Write to jialuode@gmail.com.

Get Quote