← Back to Carrying & Impact Idlers
CEMA D Unequal Troughing Idler CEMA D
Carrying & Impact Idlers · BW 24"–72"

CEMA D Unequal Troughing Idler

CEMA D · offset L1/L2 · 20/35° · heavy channel
CEMA GradeD (Heavy-Duty)
Roller LayoutL1 center longer, L2 sides shorter
Roller Diameter5" & 6" (Ø127–150mm)
Trough Angle20° / 35°
Belt Width24"–72" (600–1800mm)
FrameThick channel frame
SealIP66 labyrinth

Product Overview

Built to CEMA D heavy-duty, the Unequal Troughing Idler pairs a longer center roller with shorter side rollers to tune belt support in aggregate and mining transition zones and cement carry-side belts. The offset L1/L2 layout eases edge stress on 24–72 inch belts, while a thick channel frame, sealed precision bearings and IP66 labyrinth seals deliver reliable service where a CEMA E unit would be over-spec. It is a direct replacement for matching D-grade unequal frames.

Key Features

CEMA Grade
D (Heavy-Duty)
Roller Layout
L1 center longer, L2 sides shorter
Roller Diameter
5" & 6" (Ø127–150mm)
Trough Angle
20° / 35°
Belt Width
24"–72" (600–1800mm)
Frame
Thick channel frame
Seal
IP66 labyrinth

Applications

How to Choose This Component

Why Source These Spare Parts From Us

Frequently Asked Questions

What build grade and rating is the CEMA D Unequal Troughing Idler?

CEMA D Unequal Troughing Idler is supplied at D (Heavy-Duty). It is engineered to match CEMA D/E and ISO expectations for BW 24"–72" belt duty and can be customized to your dimensions, lagging and finish.

What belt widths does the CEMA D Unequal Troughing Idler cover?

This component is sized for BW 24"–72". Send your exact belt width, required angle or diameter and installation spacing when requesting a quote so we can confirm a direct, drop-in fit.

How is the CEMA D Unequal Troughing Idler sealed against dust and water?

Protection follows IP66 labyrinth. Labyrinth-style sealing keeps grease in and fines, moisture and wash-down out, extending service life in harsh bulk-handling conditions.

Can I order a custom CEMA D Unequal Troughing Idler?

Yes. Dimensions, lagging or coating, seal, shaft and finish are built to your specification; standard lead time is 15–25 working days and 30–45 days for fully custom builds.

Ordering & Customization

Typically Paired With

Components commonly ordered alongside this part to complete the station:

Related Products

← Previous
CEMA E Unequal Troughing Idler
Next →
CEMA E Equal Impact Troughing Idler

Request a Quote

Specifications for: CEMA D Unequal Troughing Idler. Send us your requirements and we'll reply within 48 hours.

Prefer email? Write to jialuode@gmail.com.

Get Quote